500kW
Modular building block, with phased expansion
175+ kW
Density per cabinet, no aisle containment
30–60 days
Target deployment on qualified sites*
Factory acceptance testing reduces field integration and commissioning uncertainty before equipment ships.
*The 30–60 day target applies to qualified sites with adequate power and normal approvals.
The gap inside a powered building
YOUR SITE MAY ALREADY HAVE
Allocated utility power A commercial or industrial building Fiber, security and basic distribution
MODERN AI COMPUTE NEEDS
High-density power distribution Liquid cooling and room heat removal Preconfigured racks, controls and commissioning
GridReady supplies that repeatable layer, between your building infrastructure and your GPU servers.
Factory and site work run in parallel
01 QUALIFY
Confirm power, access, layout and site interfaces
02 CONFIGURE
Finalize racks, cooling zones and power connections
03 PREPARE
Factory assembly and testing run alongside site preparation
04 CONNECT
Set equipment, connect utilities and commission the system
INSIDE THE CABINET
Arrives as one integrated thermal and power assembly.
Each cabinet supports a range of GPU configurations, with no aisle containment needed.
Explore System Specs
Cooling
Flexible cooling within acommon 500 kW envelope
Explore MoreAIR
Front and rear doorheat exchangers
Liquid
DIRECT TO CHIP
Liquid cooling throughthe manifold
Hybrid
Both, matched to theservers in each cabinet